Основная Информация.
Описание Товара
1 | Material: | carbon steel (ASTM A234WPS, A234WPC, A420 WPL6), (ST45.8 A105 A106 STG42) Alloy steel(ASTM A234 WP12/WP11/WP22/WP5/WP9/WP91) Stainless steel(ASTM A403 WP304/WP304L/WP316/WP316L) |
2 | Standard: | ASME/ANSI B16.9, DIN2650,2615,2616,2617,JIS B2311, 2312,2313, EN 10253-11, EN10253-2, GB |
3 | Size: | 1/2"-48" |
4 | Thickness: | SCH10,SCH20,SCH30,SCH STD, SCH40, SCH60,SCH XS, SCH80, SCH100, SCH120,SCH140,SCH160,SCH XXS |
5 | Type: | Elbow, tee, reducer, nipple, plug, union, bushing, cap, etc |
6 | Surface: | Transparent oil, rust-proof black oil, hot galvanized |
7 | Weight: | Heavy light, light weight |
8 | MOQ: | 1 piece |
9 | Packaging: | 1)Wooden case 2)Pallet 3)As per customer's requirements |
10 | Application: | Oil, chemical industrial, water conservancy, electric power, boiler, machinery, metallurgy, etc |
Hebei Cangrun Pipeline Equipment Co.,Ltd specialized in pipe fittings ,flanges and nipples. Our company has strong technical force. With complete
production equipment, it has more than 120 sets of production equipment, including 8000 tons of four column press, 1600 tons of pushing machine,800 tons of large pipe bending machine and 8 tons of forging hammer. It can produce valves, flanges, elbows, tees, crosses, reducers, pipe
caps, sockets and other pipe fittings and extension products of all specifications of carbon steel, alloy steel, stainless steel, pipeline steel, low-
temperature steel and other materials according to domestic and international and industrial standards, We adhere to quality first, customer first, is
our purpose.
1. What about your MOQ ?
MOQ is one piece, we can offer sample for free, customer just pay the transport charge.
2.What is the average lead time?
For samples, the lead time is about 7 days. For mass production, the lead time is 20-30 days after receiving the deposit payment. The lead times
become effective when (1) we have received your deposit, and (2) we have your final approval for your products. If our lead times do not work with
your deadline, please go over your requirements with your sale. In all cases we will try to accommodate your needs. In most cases we are able to do
so.
3.What about payment term ?
You can make the payment to our bank account, Western Union or PayPal:
30% deposit in advance, 70% balance against the copy of B/L.
4. What about package ?
As usual with wooden pallet, wooden case, we can also pack the products as customers' requirement.